11.09.2011

Basement Renovation: Planning

I know what you're thinking....you have an infant and you are trying to start another renovation NOW????  Yea, I'm thinking the same thing.......but there really isn't a perfect time to start this type of project (well maybe before Pace was born, but its clearly too late for that), so we figure we might as well get it done before the winter.  After the snow starts, we would have to shuttle all of the supplies through the kitchen.  Yikes!!  NOT ideal to say the least....and probably not even possible for some of the material.

So here is what it looked like when we moved in......lots of clutter (from the previous owners), but pretty much a blank slate:





It is basically the full footprint of the house, we are just keeping a small portion of it (about the size of the dining room) unfinished and will use that space for storage.  The main goal of this renovation is to add some play and work space to our home.  Currently our guest bedroom upstairs is doubling as an office, so it will be nice to have a separate space for both.  We are planning to have a separate office space (below the mudroom/kitchen area), a full bath (below the kitchen and half bath) and a play/entertainment area (below the living room).  As I write this out I realize that it would be SO much easier to just show you the floor plan rather than try to explain it all, but I haven't taken the time to create one just yet.  Once we get a few more details finalized, I will make sure to show you the plan a little more clearly!! 

Normally we like to do the work ourselves, but with our little bundle of joy, it's a little harder to be a complete renovating partnership like we used to be.  We are still planning on doing some things here and there, but the big stuff is being left up to the professionals, like the plumbing, heating and electrical.  We are going to do most of the framing, drywalling, tiling, painting, flooring and installation of fixtures.  It will help us save a little money on the total project and it will keep our DIY skills nice and sharp!!  Hehe.  Believe it or not, I am actually excited to do some tiling again.  I know that I was a little overwhelmed with the kitchen backsplash last fall, but I think that it will be much easier the second time around.  None of those first-time jitters....hopefully!  Still unsure of what we are using for all of the materials and finishes, but once I get it all planned out, you will be the first to know.  We are shooting for a one-month project plan, but as with most things, there will probably be delays. 

Here's hoping everything goes smoothly!!

Next up, I will try to put together a floor plan to show where everything is going to be.  The contractor is coming by tomorrow to discuss a few things, so hopefully he will help me make some decisions.

As always, I'll keep you posted on all the developments....and definitely on a more regular basis than I have been.  Sorry again about that!  This whole mom thing is AMAZING, but it sure does take up a lot of time.  Haha.  Every time I think I can sit down and write, I think of 7 other things that need to get done before he wakes up.  Yikes!

5 comments:

  1. This comment has been removed by a blog administrator.

    ReplyDelete
  2. Thanks for the post. I had been looking for something related and found your web site in the process.. I will definitely be back for more.

    ReplyDelete
  3. I can't wait to start on my own basement remodeling project - my basement looks similar to yours at the moment - will be following along to get ideas!

    ReplyDelete
  4. Great stuff here. The information and the detail were just perfect.
    Basement Remodeling Akron

    ReplyDelete
  5. It's never too lately to meliorate your information and your listing has me.homebuyerhoustonhowwebuy

    ReplyDelete